Started an oak timber frame home and bridge milling job today sure was good to have full throttle back.
Even with an 80 mile drive to the site, setting up the mill on soft ground which meant digging down to solid ground and getting the site set up so logs were coming in and timbers, braces, flooring and bridge components were all going out in different sorts, we still put out 3,000 bft. with 6 hrs of run time.
Only piece of equipment on site is a D-9 with grapples, so all the big stuff was unloaded with man power and a beam roller.