Well, if I add the fuel at .40 per mile I get $60.00. With the fee of $135 at the mill site, that gives me $195, then I add Kirks 40% and I get $273 a cord. That might be a little high? Or, I can take 40% of the $135 and do the total. Lets see, that makes the per cord price $251.